04 · FAT, INSTALLATION & SAT
Commission with a live evidence model, not a document scramble.
ALVA assembles verification evidence from design and manufacturing, tracks punch items and preserves the connection between contractual acceptance criteria and what is observed on the machine.
78%GATE READY
READINESS
Evidence status before FAT
FAT records24/27ready
Open NCR1mechanical
I/O checks96%mapped
Customer approvals2/3one pending
VERIFICATION THREAD
Acceptance criteria stay linked to origin
| Test | Origin | Status | Evidence |
|---|---|---|---|
| FAT-12 Flow | REQ-047 | Ready | Protocol v4 |
| FAT-18 CIP | REQ-083 | Ready | Material + sequence |
| FAT-21 Alarm | REQ-122 | Review | PLC rev pending |
| SAT-07 Capacity | Contract §7.3 | Planned | Site data needed |
COMMISSIONING CO-PILOT
ALVA prepares the next action from the evidence gap.
Rather than simply reporting 78% readiness, it identifies the exact blockers, owners and source documents required to reach the gate.
Next: obtain FAT protocol approval → close NCR-17 → complete final PLC alarm test → issue controlled FAT pack.
HANDOVER
Installed asset inherits its engineering history
As-designedmodels · calculations · requirements
→
As-builtserials · certificates · deviations
→
As-operatedsignals · service · performance