CONCEPT DEMONSTRATOR · FICTIONAL ALVA EXPERIENCE · NOT AN OFFICIAL ALFA LAVAL PRODUCT OR WEBSITE
LIFECYCLE / 02

Design & configure

02 · ENGINEERING & CONFIGURATION

Make every design decision traceable to intent and evidence.

ALVA links customer requirements to equipment, calculations, interfaces and verification criteria. A change is evaluated across design, cost, schedule and downstream test evidence before release.

86%DESIGN CONFIDENCE
SYSTEM MODEL

Configured process architecture

▣
Feed moduleF-101
≈
Thermal moduleHX-201
◉
SeparatorSEP-301
⇄
Valve matrixVLV-4xx
⇥
TransferP-104
TRACEABILITY

Requirement → design object → verification

REQ-04714.2 m³/h peak flow
→
HX-201 / P-104Duty & operating point
→
FAT-12 / SAT-07Performance evidence
REQ-083CIP at 85°C
→
Seal / valve classMaterial compatibility
→
DOC-19Material certificate
CHANGE IMPACT

Customer asks for +18% peak flow.

ALVA identifies two affected design objects. It recommends +8 HX plates, verifies pump operating range, preserves current pipe size, and estimates a +€41k commercial effect.

Propagation: requirement → thermal model → equipment selection → BOM → price → FAT acceptance criterion.
DESIGN HEALTH

Confidence by engineering domain

Process94%validated
Mechanical89%interfaces stable
Controls82%3 open items
Verification78%criteria evolving